Retrofit methodology

Our retrofit methodology

When performing a system upgrade we ensure that your production downtime is reduced to the bare minimum, and that you don’t suffer any production losses. We follow a fixed methodology for every retrofit project. This means we can perform the upgrade quickly and with little disturbance.

The cornerstones of our retrofit methodology include the following points:
  • a clear conversion plan beforehand
  • an analysis of all activities, possible consequences and risks, with risk-limiting procedures and fall-back scenarios
  • strict execution planning
  • simultaneous use of old and new controls during the conversion
  • return to the old control within four hours in the event of any unforeseen circumstances
  • all functions tested off-line beforehand
  • switchovers performed during weekends and holiday periods to the maximum extent possible to avoid loss of production

Contact a specialist

and get an answer within
three working days

What customers say

Leo Berrens,
Janssen Pharmaceutica

“During the upgrade production downtime was absolutely out of the question. Egemin prepared everything off-line and thoroughly tested it later on our installation, plug-and-play”.